Draft Version of the Annual Report for the ‘General Permit for the Discharge of Stormwater from Small Municipal Separate Storm Sewer System’

A draft version of the Annual Report for the ‘General Permit for the Discharge of Stormwater from Small Municipal Separate Storm Sewer System’ is now available (February 15, 2019).   While it is posted online, a hard copy is also available for viewing in the engineering department at 50 Boston Street, Town Hall South.

Posted in Alerts